All the information about withdrawals, accounts, Secondary Market and other topics can be found in this FAQ blog post. In case you still have questions, you can contact us at info@evoestate.com

December 03, 2020

Update from the developer:

The developer has finished the reform of opportunity Sant Joan Despí Centro and the developer has signed the sale. The developer's team of professionals industrialists has worked to obtain an excellent reform, applying the best qualities to obtain a property with better finishes. The developer will advance soon with the repayment of the loan.

What did happen in this reform?


Floors and walls
• Generic: Imitation porcelain stoneware flooring hydraulic
• Tiled walls
Carpentry
• White lacquered interior doors
• Exterior carpentry in aluminum with RPT and double glazed
Kitchen
• Furniture in white lacquered color
• Silestone worktop, White store model
• Exposed extractor hood, oven and induction
Faucet
• Single-lever mixer
• Shower columns Installations
• Junk switches
• Air conditioning ducts
• DHW with thermo accumulator 100L

 Finalized works:

○ Takedowns
○ Falling
○ Floor
○ Pladur partitioning
○ False ceilings
○ Installation sanitation
○ Electrical installation
○ Installation of air conditioning (ducts)
○ Ventilation installation
○ Plumbing
○ Interior flooring
○ Tiled bathrooms
○ Interior carpentry
○ Sanitary installation and taps
○ Electrical mechanisms
○ Bathroom furniture
○ Kitchen furniture and worktop
○ Rear patio flooring
○ Aluminum carpentry
○ Installation of household appliances
○ Commissioning of machinery for air conditioning and ACS

A new document containing pictures of the progress has been added.


September 10, 2020

Update from the developer:

The developer has finished the reform of opportunity Sant Joan Despí Centro and received a reservation, their team of industry professionals has worked to obtain an excellent reform, applying the best qualities to obtain a property with the best finishes. The developer continues for the signing of the sale before a notary.

What did the developer do in this period?

Floors and walls
• Generic: Limitation porcelain stoneware flooring
hydraulic.
• Tiled walls


Carpentry
• White lacquered interior doors
• Exterior carpentry in aluminum with RPT and double
glazed


Kitchen
• Lacquered white furniture
• Silestone worktop, White store model
• Exposed extractor hood, oven and induction


Faucet
• Single-lever mixer
• Shower columns


Facilities
• Junk switches
• Air conditioning ducts
• DHW with thermo accumulator 100L

Finalized work

○ Takedowns
○ Falling
○ Floor
○ Plasterboard partition
○ False ceilings
○ Sanitation installation
○ Electrical installation
○ Air conditioning installation
(ducts)
○ Ventilation installation
○ Plumbing
○ Interior flooring
○ Bathroom tiling

○ Interior carpentry
○ Sanitary installation and taps
○ Electrical mechanisms
○ Bathroom furniture
○ Kitchen furniture and worktop
○ Rear patio flooring
○ Aluminum carpentry
○ Installation of
home appliances
○ Commissioning of
machinery for air conditioning and
ACS

A new document was uploaded containing photos of the actual progress.


Cookie notice
We use cookies for analytics, advertising and to improve our site. You agree to our use of cookies by closing this message box or continuing to use our site.